    "Our preference was AMD EPYC based systems. We ordered. We were then informed delivery time was 10 to 14 MONTHS due to supply issues on EPYC CPU's.

    We were offered substitution to Intel which led to 20% more servers at a lower price point that could be delivered in 4 weeks. They started to arrive in 2 weeks.

    The cloud consumes the same CPU's as the enterprise. And in AMD's case this is fully constrained as the cloud buy's all they can produce causing a shortage in the enterprise space.

    Intel only posted growth in enterprise as AMD has nothing left to sell. This is not a win to count on into the future."
    [link]

    via: [link]

    10-14 hónap, az elég brutális.
    Vajon mi lehet a szűk keresztmetszet?
    Ugyan nem részletezi, hogy milyen típust szeretnének. Ha mondjuk kifejezetten Milan-X-ről lenne szó, akkor még érteném, de feltételezem, hogy abban az esetben nem lett volna elfogadható az Intel ajánlat.
    Következésképpen sima Milan (v Rome) lehetett.

    Eközben az AMD bagóért gyárt gpu-kat (amiből mondjuk a Navi24 N6-on készül, de a többi N7) és gond nélkül kapható a Vermeer is.
    Ebből kifolyólag eléggé kizártnak tartom, hogy az N7-es wafer kapacitás lenne a szűk keresztmetszet. Lehetséges volna, hogy waferből ugyan van elég, de kevés üti meg a szükséges fogyasztási értéket? Dehát most került tömeggyártásba a B2 stepping, aminél még jobb fogyasztási értékeket is mértek.
    Vagy az IOD lenne elérhető limitált mennyiségben (gondoljunk csak a 2024-ig meghosszabbított GF WSA-ra!)
    Gondolom ha más összetevő lenne kevés - pl alaplap - akkor nem nevezték volna meg az EPYC CPU-t.

    Vagy kamu poszt?